November 10, 2002 (Sunday)

It doesn't appear that much has advanced in the last couple of days, the forms for the concrete abutment have been removed, the barges were moved to the north side of the pier, and the parking lot has been organized.

 

Picture of pier from north on Bank Avenue Photo from bottom of River at low tide showing new reinforcement at South end of pier. The Steel on the east side of pier is in pretty good shape, it will be sanded & coated with water proof sealer.
From the base of the pier (Low tide) looking East at the new concrete abutment for the walkway.  A picture sent in from Linda Hollins from Nov. 8th taken from the lawn south of the parking lot. You can see the temporary steel pilings on the South (down river) side of the pier and the reinforcement from the Club house to the front of the pier. 