November 23 (More than half way there!)
Crane and Barges gone, Reinforcement installed on all sides of the pier. The sand blasting of the older steel reinforcement on East (Riverton) end of pier has yet to be started and installing the wood walkway from the parking lot to the pier has yet to be started. Correction: I had said that the cranes were being rebuilt, but they are also being modified to use 220 volt power and work in two speeds, so they should be vastly improved. Whether the old Mariner fleet will move at the faster pace is yet to be seen!
| The Crane and Barges are gone | The reinforcement complete on the upriver side of the Pier |
| The reinforcement is complete on the downriver side of the pier. | The sand blasting and recoating have not yet started. The walkway is not started. |